Klorad Works

One twin, from construction to operation.

Bridges, tunnels and elevated roads, with every sensor in place. The twin starts on site, moves to the operator with the structure, and keeps running.

40.6150 N 22.9560 E
01The problem

A structure outlives its files.

Each phase of a project keeps its own records, and few of them reach the next.

  1. 01

    During construction

    Instrument readings arrive in sheets and portals, far from the model.

  2. 02

    At handover

    The as built model arrives as files nobody opens again.

  3. 03

    In operation

    Monitoring, tunnel systems and inspections each live on another screen.

02The twin

Every instrument, against its limits.

Strain gauges, bearings and accelerometers in place on the model, each against the thresholds the designer set. An alarm arrives with its response plan; the engineering judgement stays with your engineers.

Live
40.6150 N 22.9560 E
03Who sees what

Each party sees its own part.

During construction and in operation, every party works in its own view of the same twin.

  • Project management

    The whole structure, its schedule and every alarm.

  • Monitoring engineer

    The instruments, their thresholds and the response plan.

  • Subcontractors

    Their own sections, and nothing else.

  • Authority and public

    Reports for the authority; works and closures for neighbours.

04Your systems

Connects to what the project already runs.

Your instruments and systems keep working on their own. Klorad reads them through open standards.

  • Monitoring instruments

    Readings from your loggers over MQTT or OGC SensorThings.

  • Tunnel systems

    Ventilation, lighting, fire detection and SCADA, through OPC UA or Modbus.

  • Design model

    IFC 4.3 for the structure, GIS for what surrounds it.

  • Site

    Gates and cranes, against the conditions of your permits.

  • Environment

    Wind, noise and dust, against the limits you must keep.

  • Schedule

    Progress against the plan, on the elements it concerns.

05Delivery

Handed over with the structure.

The construction twin becomes the operating twin, with the same model and its whole history. Its licence moves from the contractor to the operator.

Runs on Klorad Cloud, Dedicated or Sovereign: our cloud, a dedicated environment, or your own servers.

  1. 1

    We model the structure

    Your IFC 4.3 model and GIS become one twin of it.

  2. 2

    We connect the instruments

    Implementation is scoped as its own project, with you or your integrator.

  3. 3

    The operator takes it over

    The same twin, its history and its licence move to operation.

Bring us your next structure.

Send us the model and the instruments you plan. We will show you the twin on them.